CS614 Assignment No.3 Solution and Discussion

d6c14f61-90d2-4d0f-bf70-844cce39dfec-image.png
Assignment No. 3
Semester: Spring 2019
CS614 – Data Warehousing

Total Marks: 20

Due Date:
August 01, 2019

Objectives:
After completing this assignment the students will be able to:
• Understand parallelism
• Calculate speed-up time for pipelining
• Calculate Costs associated with nested loop joins while indexing is not used

Instructions
Please read the following instructions carefully before submitting assignment:
It should be clear that your assignment will not get any credit if:

o Assignment is submitted after due date.
o Submitted assignment does not open or file is corrupt.
o Assignment is copied (From internet/ to from students).
o Assignment is submitted other than word format (.doc, .docx).

Assignment

Question No. 1

Consider a garments factory where a Men’s casual shirts are manufactured. Each Shirt requires 15 minutes for completion. The factory management is now interested in introducing a pipeline where cutting, stitching and finalizing the shirt will be done in parallel.

You are required to calculate the Speed-up that could be achieved after implementing pipeline for manufacturing of 25 shirts in a row.

Question No. 2
Consider two database tables X and Y, we are required to join these tables using Nested-Loop Join, Assume that indexing is not used in mentioned tables.
The table information is given as:
Size of Table X = 600 blocks
Size of Table Y = 900 blocks
Qualifying blocks for Table X = 50
Qualifying blocks for Table Y = 100

Calculate the join cost for X&Y and also for Y&X; after calculations mention which Table should be the outer one X or Y.

Deadline:
Your assignment must be uploaded on VULMS on or before August 01, 2019. While August 02, 2019 will be a bonus day for assignment submission. After the bonus day, no assignment would be entertained via email.

Answer will be same after convert.

84e0807a-616d-4c42-84a2-4f63289e5a4a-image.png
4476461b-9e74-4125-ad00-78dac6fb19df-image.png