      The size of software can be measured by using __________. size

      The size of software can be measured by using __________.

      What is the most common reason IT projects fail?
      Projects most commonly fail because there is a lack of attention and efforts being applied to seven project performance factors: Focus on business value, not technical detail. This involves establishing a clear link between the project and the organizations key strategic practices.Process Driven Approach
      If several entities are always created together and deleted together then this is a strong
      indication that they should be grouped into a single logical file.

      If an employee number which appears twice in an ILF/EIF , count the DET __________.

      If an employee number which appears twice in an ILF or EIF as (1) the key of the
      employee record and (2) a foreign key in the dependent record, count the DET
      only once.

      Metrics to assess the quality of the analysis models and the corresponding software specification were proposed by ________

      Metrics to assess the quality of the analysis models and the corresponding software
      specification were proposed by Davis in 1993 for these seemingly qualitative
      characteristics.

      Every project has a defined number of staff members. As time allocation occurs, the project manager must ensure that no more than the allocated number of ------------- have been scheduled at any given time.

      Effort validation
      Every project has a defined number of staff members. As time allocation occurs, the
      project manager must ensure that no more than the allocated number of people has been
      scheduled at any given time.

      In _________________, there is both vertical and horizontal communication.

      W5HH Principle consists of seven Questions.

      W5HH Principle
      Barry Boehm has suggested a systematic approach to project management. It is known as
      the WWWWWHH principle. It comprises of 7 questions. Finding the answers to these 7
      questions is essentially all a project manager has to do. These are:
      • WHY is the system being developed?
      • WHAT will be done?
      • By WHEN?
      • WHO is responsible for a function?
      • WHERE they are organizationally located?
      • HOW will the job be done technically and managerially?
      • HOW MUCH of each resource (e.g., people, software, tools, database) will be
      needed?

      Certain reusable software components were to be developed by a/an 3rd party having no knowledge of its internal design standards.

      Which of the following is not a software metric?

      Measures, Metrics and Indicators
      Before we can talk about the measurement process, we first need to understand the terms
      measure, metrics, and indicators. The terms measure, measurement, and metrics are often
      used interchangeable but there are significant differences among them. Within the
      software engineering domain, a measure provides a quantitative value of some attribute of
      a process or a product. For example, size is one measure of a software product.
      Measurement is the process or mechanism through which the measure is taken. For
      example, FP analysis is a mechanism to measure the size of software. Measurement
      involves taking one or more data points related to some aspect of the product or process.
      Software metric relates individual software measures to provide a normalized view. For
      example, defects per function point are one metric which relates two individual measures,
      that is, defects and size, into one metric.

      In context of moving range and individual control charts, LNPL stands for:

      CS605 - Software EngineeringII
    • CS605 Assignment 1 Solution and Discussion

      cyberian

      Re: CS605 Assignment 1 Solution and Discussion

      CS605 - Software EngineeringII
    • CS605 GDB 1 Solution and Discussion

      zareen

      CS605 GDB 1 Solution and Discussion

      CS605 - Software EngineeringII
    • CS605 Assignment 3 Solution and Discussion

      zareen
      Assignment No. 03

      Semester: Fall 2019
      CS605 - Software Engineering-II
      Total Marks: 10

      Due Date: 24/01/2020

      Assignment no. 3 covers Lec#23 to Lec#34.

      Objectives of Assignment:

      • To learn the basic objective of software lifecycle models.
      • To understand the concepts of software change management.

      Uploading instructions:

      • Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docx etc will not be accepted).
      • No assignment will be accepted through email.

      Rules for Marking:

      It should be clear that your assignment will not get any credit if:

      • The assignment is submitted after due date.
      • The submitted assignment does not open or file is corrupted.
      • Your assignment is copied from internet, handouts or from any other student
      (Strict disciplinary action will be taken in this case).

      Question no. 1: 5 Marks

      We have studied different software lifecycle models and project management techniques in this course. We have observed that various software application types require different software engineering models and techniques for their design and development.
      Explain the reason with at least two example cases.

      Question no. 2: 5 Marks

      A Software Development team has been asked by the higher management of a renowned company to scrap and re-design the Software System of their organization. Although the current Software System is already of high quality and is working absolutely fine.
      What could be the potential reasons for this decision? Justify your answer with at least two valid reasons.

      Note:
      Brief and relevant answer should be given (to the point). Long stories are not required.
      Irrelevant and wrong statements will result in negative marking.
      Copied assignments will get zero marks.

      Submit “.doc” file only. Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then email us at [email protected]

      Deadline:
      Your assignment must be uploaded/submitted on or before 24th January 2020.

      CS605 - Software EngineeringII
    • CS605 Assignment 2 Solution and Discussion

      zareen

      Assignment No. 02
      Semester: Fall 2019
      CS605 - Software Engineering-II
      Total Marks: 15

      Due Date: 6/12/2019

      Assignment no. 2 covers Lec#8 to Lec#17.

      Objectives of Assignment:

      • To learn the basic objective of software project planning.
      • To understand the basic objective of requirements of a software project.

      Uploading instructions:

      • Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docx etc will not be accepted).
      • No assignment will be accepted through email.

      Rules for Marking:

      It should be clear that your assignment will not get any credit if:

      • The assignment is submitted after due date.
      • The submitted assignment does not open or file is corrupted.
      • Your assignment is copied from internet, handouts or from any other student
      (Strict disciplinary action will be taken in this case).

      Scenario: 15 Marks

      Suppose you are the Project Manager newly established Company that has initially hired 500 employees in its 4 departments (i.e. HR Department, Marketing Department, Sales Department, and Finance Department). The size of the company will grow later on. The owner of this organization is planning to implement a state-ot-the-art Employee Management System (EMS) Software in this Company.
      Based on this scenario, answer the following questions:

      Being a Project Manager, you have to take the decision for “Buy or Build”. Will you buy the Software from any renowned Software house or Developed your own EMS System? You have to Justify with solid reasons in any case. [5 marks]

      You have to write 5 functional requirements each for any two of the departments (out of four) of your choice, that must be fulfilled during the software development. [5+5 marks]

      Note:
      Brief and relevant answer should be given (to the point). Long stories are not required.
      Irrelevant and wrong statements will result in negative marking.
      Copied assignments will get zero marks.

      Submit “.doc” file only. Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then email us at [email protected]

      Deadline:
      Your assignment must be uploaded/submitted on or before 6th December 2019.

      CS605 - Software EngineeringII
    • CS605 Assignment 1 Solution and Discussion

      zareen

      Assignment No. 01
      Semester: Fall 2019
      CS605 - Software Engineering-II
      Total Marks: 10

      Due Date: 19/11/2019

      Assignment no. 1 covers Lec#1 to Lec#8.

      Objectives of Assignment:

      • To learn the basic objective of software process models.
      • To understand the applications of different SDLC models.
      • To learn about the different phases of these process models.

      Uploading instructions:

      • Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docx etc will not be accepted).
      • No assignment will be accepted through email.

      Rules for Marking:

      It should be clear that your assignment will not get any credit if:

      • The assignment is submitted after due date.
      • The submitted assignment does not open or file is corrupted.
      • Your assignment is copied from internet, handouts or from any other student
      (Strict disciplinary action will be taken in this case).

      Question no. 1: 5 Marks

      Suppose you are developing a large software project that has multiple dependable modules. It will be faster and cheaper to fix the encountered bugs before you write the subsequent new code. Why?
      Give at least two reasons. Each reason should be at maximum two sentences long.

      Question no. 2: 5 Marks

      Suppose you are a Project Manager at a large organization and your team has been assigned a project to develop an ERP system for your Organization.
      State (with 02 valid reasons) which Software Process Model you will use and Why ?

      NOTE: Submit “.doc” file only. Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then email us at [email protected]

      Deadline:
      Your assignment must be uploaded/submitted on or before 19th November 2019.

      CS605 - Software EngineeringII
    • Assignment No. 01
 Semester: Spring 2019 CS605 - Software Engineering-II

      M

      Assignment No. 01
Semester: Spring 2019
      CS605 - Software Engineering-II

      Total Marks: 15

      Due Date: 17th May 2019

      Assignment no. 1 covers Lec#1 to Lec#8.

      Objectives of Assignment:

      • To learn the basic objective of software process models.
      • To understand the applications of different SDLC models.
      • To learn about the different phases of these process models.

      Uploading instructions:

      • Your assignment must be in .doc format.(Any other formats like scan images, PDF, Zip, rar, bmp, docx etc will not be accepted).
      • No assignment will be accepted through email.

      Rules for Marking:

      It should be clear that your assignment will not get any credit if:

      • The assignment is submitted after due date.
      • The submitted assignment does not open or file is corrupted.
      • Your assignment is copied from internet, handouts or from any other student
      (Strict disciplinary action will be taken in this case).

      Question no. 1: 5 Marks

      Give reasons for your answer based on the type of system being developed, suggest the most appropriate generic Software Process Model that might be used as a basis for managing the development of a Safety system for the nuclear power plants.

      Question no. 2: 5 Marks

      Explain why incremental development is the most effective approach for developing business software systems. Why is this model less appropriate for developing real-time systems?

      Question no. 3: 5 Marks

      Mention at least two reasons why it is more expensive to fix a bug that a customer encounters in production than a bug that the developer discovers during development.

      NOTE: Submit “.doc” file only. Every student should provide his/her own work, exact copying of the assignment (or some portion of the assignment) from the internet or other students will lead to copy case and zero marks will be awarded. Do not put any query on MDB about this assignment, if you have any query then email us at [email protected]

      Deadline:
      Your assignment must be uploaded/submitted on or before 17th May 2019.

      Spring 2019_CS605_1.docx

      CS605 - Software EngineeringII

    CS605 GDB 1 Solution and Discussion

    CS605 - Software EngineeringII
    cs605 discussion fall 2019 gdb 1 solution
    1
    1
    169
    Loading More Posts
    • Oldest to Newest
    • Newest to Oldest
    • Most Votes
    Reply
    • Reply as topic
    Log in to reply
    This topic has been deleted. Only users with topic management privileges can see it.
    • zareen
      zareen Cyberian's Gold last edited by

      CS605 GDB 1 Solution and Discussion

      1 Reply Last reply Reply Quote 0
      • First post
        Last post

      50% Off on Your FEE Join US!

      Quiz 100% Result If you want to know how you can join us and get 50% Discout on your FEE ask Cyberian in Chat Room! Quiz 100% Result Quiz 100% Result
      solution1241 discussion1194 fall 2019813 assignment 1425 assignment 2295 spring 2020265 gdb 1246 assignment 382 crw10174 spring 201955
      | |
      Copyright © 2021 Cyberian Inc. Pakistan | Contributors
      Live Chat